Hydropower plant

Refurbishment of the electrotechnical and process control installation of a hydropower plant with 2 generators. Engineering, CAD, switchgear cabinets, software development, commissioning and training of employees were part of the scope.

Control System:
3 x Simatic S7 400

Visualisation System:
2 x redundant work stations with WinCC (KIMA-Smart-Operation-Software)

Network System:
Industrial Ethernet via redundant, fiber optical ring

Speciality:
Redundant DC supply with battery unit and inverter

Built in:
2012 - 2014