Stone quarry, mineral mixing plant and truck loading

Complete renewal of outdated electrical and automation equipment during operation. The two-week commissioning took place during the annual winter inspection.

The engineering, CAD, switchgear cabinet construction, software development, installation, and commissioning were part of the scope of supply.

Control System:
1 x SIMATIC S7-400

Visualization System:
1 x WinCC (KIMA Smart Operation Software)
2 x KTP1000 Basic Panel

Network System:
Profibus
Industrial Ethernet

Speciality:
- reconstruction during ongoing Operation
- PLC independent manual operation via local switch
- "open wiring" in the switchgear cabinets (according to factory standards)

Built in:
2013