The entire electrical and automation technology was implemented by KIMA for six different plant sections, among others, in a short period of time, in part in parallel and during ongoing operation. These include:
1 x Revitalization (six basins)
1 x Rain overflow basin (RÜB)
1 x Discharge pumping station
1 x Intermediate pumping station
2 x Wastewater pumping station
Control System:
7 x SIMATIC S7-300 CPU 315-2DP/PN
Visualisation System:
Extension of the process control system realized by KIMA (WinCC/Step7)
• 2 x redundance WinCC Servers
• 10 x WinCC Clients
• 2 x Remote access / readiness
• 3 x Acron operating stations
• 1 x SINAUT ST7CC
2 x TIA Panel TP2200 TIA Siplus
3 x TIA Panel TP900
Network System:
Profinet
• Connection of decentralized periphery
• Connection of Frequency converter
Plant bus
• Connecting between SPS and Server
Speciality:
SPS-independent control concept
IT- Security: including segmentation and secure communication of remote stations via ScalanceS
Radio link or SHDSL modems for TCP/IPbased integration of remote operating stations
EX-areas
Measurement
Lightning protection systems (inside and outside)