Waterworks with Siemens control system PCS7

The entire electrical and automation technology for six different plant sections was successively reimplemented by KIMA. These include:
2 x Raw water extraction pumping stations
1 x Infiltration system
1 x Well field
1 x Clean water pumping station
1 x Booster system

Control System: 
6 x SIMATIC S7-400 CPU 410

Visualization System: 
Extension and migration of the PCS7 multiserver project realized by KIMA
(6 x PCS7 Servers)
(4x PCS7 Clients/ resp. multi-clients)
(1x ES)

Network System: 
Profinet
• Connection of decentralized periphery
• Connection of Frequency converter
Ethernet ad Modbus TCP/IP:
• Connection of the plant bus (PCS7)
• Connection of important signals per AS to a higher-level network control station via Modbus

Speciality: 

PCS7 V9.x with APL and IL
4 x TP1900 with APL/IL Building blocks projected


Migration PCS7 (V8.x to V9.x)


Optimized pump operation through automated operation of the frequency converters based on the stored pump curves


MIS: Acron with June5


IT-Security: including segmentation (Automation Firewall/ScalanceS) and secure communication (VPN/V-Lan)